SKEMA SERTIFIKASI LSP PAMA

SKEMA OPERATOR ALAT BERAT

  1. Operator Excavator
  2. Operator Bulldozer
  3. Operator Motor Grader
  4. Operator Wheel Loader
  5. Operator Drilling Machine
  6. Operator Barge Loader
  7. Operator Jib Crane
  8. Operator Articulated DT
  9. Operator Heavy DT
  10. Operator Semi Dump Trailer
  11. Operator Mobile Crane Kelas 1
  12. Operator Mobile Crane Kelas 2
  13. Operator Mobile Crane Kelas 3
  14. Advance Operator Excavator
  15. Advance Operator Bulldozer
  16. Operator Light Dump Truck 
  17. Operator Liquid Truck

SKEMA MEKANIK ALAT BERAT

  1. Mekanik Excavator PC750
  2. Mekanik Excavator PC1250
  3. Mekanik Bulldozer D155
  4. Mekanik Bulldozer D375
  5. Mekanik Wheel Loader WA500
  6. Mekanik Wheel Loader WA600
  7. Mekanik Motor Grader GD705
  8. Mekanik Motor Grader GD825
  9. Mekanik Heavy DT HD465
  10. Mekanik Heavy DT HD785
  11. Mekanik Drilling Machine
  12. Mekanik Light Dump Truck
  13. Mekanik Semi Dump Trailer
  14. Mekanik Site Support Equipment (SSE) Lifting
  15. Mekanik Site Support Equipment (SSE) Pumping
  16. Mekanik Site Support Equipment (SSE) Lighting
  17. Klaster Overhaul Technical Instruction
  18. Klaster Repair and Machine Troubleshooting Technical Instruction
  19. Klaster Remove and Install Technical Instruction
  20. Klaster Preventive Maintenance Technical Instruction
  21. Klaster Basic Maintenance

SKEMA PENGAWAS OPERATIONAL

  1. Pengawas Operational Pertama
  2. Overburden Group Leader
  3. Non Blasting Overburden Group Leader
  4. Mud Group Leader
  5. Disposal Group Leader
  6. Road Maintenance Group Leader
  7. Mine Water Treatment Group Leader
  8. Coal Getting Group Leader
  9. Coal Hauling Group Leader
  10. Dewatering Group Leader
  11. Mud Dewatering Group Leader
  12. Land Clearing Group Leader
  13. Top Soil Group Leader
  14. Stockpile Group Leader
  15. Crushing & Blending Group Leader
  16. Barging Group Leader
  17. Drilling Group Leader
  18. Blasting Group Leader

SKEMA MSDM

  1. Human Capital Section Head
  2. Human Capital Department Head
  3. Okupasi Human Capital Officer
  4. Okupasi Payroll Officer
  5. Pengelolaan Program Budaya Perusahaan
  6. Instruktur Level 4 
  7. Instruktur Level 3 

SKEMA TENAGA TEKNIK KHUSUS

  1. Operasi Pemindahan Beban (Rigger)
  2. Plate Welder
  3. Pelaksanaan Peledakan Tambang Terbuka
  4. Klaster Pengoperasian Forklift 
  5. Klaster Penyambungan Pipa Polietilena (HDPE) 

SKEMA EXPERT MINING EQUIPMENT RELIABILITY ENGINEERING

  1. Pemeliharaan Sistem Engine Track Type Mining Equipment
  2. Pemeliharaan Komponen Power Train Track Type Mining Equipment
  3. Pemeliharaan Sistem Elektrik Track Type Mining Equipment
  4. Pemeliharaan Sistem Hidraulik Track Type Mining Equipment
  5. Pemeliharaan Sistem Engine Wheel Type Mining Equipment
  6. Pemeliharaan Komponen Power Train Wheel Type Mining Equipment
  7. Pemeliharaan Sistem Elektrik Wheel Type Mining Equipment
  8. Pemeliharaan Sistem Hidraulik Wheel Type Mining Equipment
  9. Pemeliharaan Sistem Engine Site Support Mining Equipment
  10. Pemeliharaan Komponen Power Train Site Support Mining Equipment
  11. Pemeliharaan Sistem Elektrik Site Support Mining Equipment
  12. Pemeliharaan Sistem Hidraulik Site Support Mining Equipment
  13. Analisa Fluida Mining Equipment
  14. Analisa Kegagalan Mesin Mining Equipment
  15. Perencanaan Pemeliharaan Mining Equipment
  16. Perancangan Strategi Pemeliharaan Mining Equipment
  17. Manufaktur Perkakas Perawatan Mining Equipment
  18. Manufaktur Automation Tools Perawatan Mining Equipment

SKEMA TYRE MAINTENANCE AND VULCANIZATION

  1. Penggantian Roda Earthmoving and Off The Road Vehicle
  2. Penggantian Roda Heavy Vehicle
  3. Pemeliharaan Harian Roda
  4. Pemeliharaan Komponen Pelek
  5. Perbaikan Ban
  6. Pelaksanaan Peeling Buffing Vulkanisir Ban
  7. Pelaksanaan Building Vulkanisir Ban
  8. Pelaksanaan Curing Vulkanisir Ban
  9. Pengawasan Penggunaan Ban
  10. Pengawasan Perbaikan dan Pemeliharaan Ban
  11. Pengawasan Vulkanisir Ban
  12. Perencanaan Pemeliharaan Ban
  13. Analisis Teknikal Ban Tingkat Dasar
  14. Analisys Teknikal Ban Tingkat Lanjut
  15. Pengembangan Komponen Roda
  16. Pemeliharaan Ban Tingkat Dasar

SKEMA EXPERT MINING ENGINEERING

  1. Basic Mine Financial Analysis
  2. Intermediate Mine Finance Analysis
  3. Advance Mine Finance Analysis
  4. Basic Mine Infrastructure Planning
  5. Intermediate Mine Infrastructure Planning
  6. Advance Mine Infrastructure Planning
  7. Mine Geothecnic Surface Mapping
  8. Mine Geothecnic Analysis
  9. Mine Slope Stability Analysis
  10. Coal Exploration Planning
  11. Coal Quality Estimation
  12. Coal Classification And Resources Reporting
  13. Ore Minerals Exploration Planning
  14. Ore Minerals Quality Estimation
  15. Ore Minerals Classification And Resources Reporting
  16. Basic Scientific Analysis And Operation Research
  17. Intermediate Scientific Analysis
  18. Advance Scientific Analysis
  19. Intermediate Operation Research
  20. Advance Operation Research
  21. Short Term Mine Planning
  22. Advance Short Term Mine Planning